Football field expansion and replacement of the artificial grass on SRC Belveder

As part of the sports and recreational center Belvedere, there are plans to expand the football field and replace the artificial turf. New LED lighting needs to be installed on the field, and the irrigation system should be operationalized.

1.125.000 EUR

Project value

Education, Sports

Project field

In preparation

Project stage

City of Rijeka

Project leader

Public

Sector

Rijeka sport d.o.o.

Project partners

The City of Rijeka Budget and EU Funds

Funding model

Project website

igor.butorac@rijekasport.hr

Email

Within the sports and recreational center Belvedere, it is necessary to develop a project, obtain the necessary permits, and expand the football field with artificial turf. The investment will cover all construction, as well as electrical and plumbing works. The dimensions of the new football field will be 100 x 64 meters with protective zones of 3 meters.

Within the newly defined boundaries of the field, it is necessary to replace the artificial turf. The plan involves replacing the existing artificial turf with a 25 mm thick shock-absorbing layer, filled with quartz sand and EPDM granules in green color. This system should fully comply with the FIFA Quality PRO standard.

The sprinkler system on the field needs to be operationalized, three floodlight poles need to be moved, and the existing floodlights need to be replaced with LED lighting. The facility should be fully equipped with sports equipment – goals, auxiliary goals, corner flags, reserve benches for players and referees on the southern side, protective padding around the entire field, and other necessary items.